Reconstruction of Dworcowa and Słowackiego Streets in Człuchów

Reconstruction of Dworcowa and Słowackiego Streets along National Road No. 25, from kilometer 62+820 to 64+800 in Człuchów.

INVESTOR:

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Gdańsku

CONTRACTOR:

POL-DRÓG Człuchów

INVESTMENT COST:

14 408 637 PLN

LENGHT/SURFACE AREA:

2 000 mb

Scope

PREPARATORY WORK

  • Demolition of road and street elements was carried out
  • Trees and shrubs were removed
  • Trees conflicting with the planned bypass were cut down

ROAD WORK

  • Complex modernization of the road

BRIDGE CONSTRUCTION

  • Strengthening the load-bearing capacity to Class B
  • Repair of damages
  • Installation of new bridge equipment components

INFRASTRUCTURE

  • Reconstruction of water supply, heating,
and gas networks
  • Modernization of power, telecommunications,
and gas equipment
  • Construction of stormwater drainage system

FINISHING WORKS

  • Modernization and construction of sidewalks
and pedestrian-bike pathways
  • Installation of street lighting

CHALLENGES AND INNOVATIVE TECHNOLOGIES

Implementation of the investment under high traffic conditions, especially during
the summer period (Bydgoszcz – Koszalin route), and under strict archaeological supervision due to the proximity of a Class A heritage site (Teutonic Castle).

English flag
Polski flag