Renovation of National Road 22

Rehabilitation with reinforcement of the pavement on National Road No. 22 (Main Accelerated Class), section Buszkowo – Chrząstowo, from km 205+748
to km 224+260. Development of green areas. Reconstruction of street lighting.

INVESTOR:

General Directorate for National Roads and Motorways, Gdańsk

CONTRACTOR:

POL-DRÓG Człuchów

INVESTMENT COST:

53 153 736 PLN

LENGHT/SURFACE AREA:

Scope

ROAD WORK

  • Widening of the national road to 7.00 meters
  • Strengthening of the pavement structure
  • Improvement of longitudinal and transverse slopes
  • Construction of bus bays and sidewalks leading
to the bays
  • Construction and renovation of reinforced private
and public driveways
  • Pavement rehabilitation at intersections with public roads
  • Reinforcement of road shoulders

INFRASTRUCTURE

  • Construction and renovation of culverts and surface drainage elements of the road

FINISHING WORKS

  • Construction of sidewalks, traffic calming measures,
and drainage systems in towns
English flag
Polski flag