PAVEMENT WORK
- Installation of granite pavement over an area of 13,000 m² with a load class of D400, featuring a repetitive pattern using slabs of 6 different dimensions.
- Impregnation and filling of the pavement joints with resin grout.

INFRASTRUCTURE
- Drainage of the square using a linear drainage system with a total length exceeding 500 meters.
- Reconstruction of the stormwater drainage system including elements of the sanitary sewage system and the water supply network.
FINISHING WORK
- Installation of lighting and illumination of 39 trees using RGB LED fixtures.
- Placement of 30 planting stations for trees using the Greenleaf Arborsystem.
- Installation of a controlled irrigation system for trees and green elements.
- Execution of stone cladding on tunnel walls adjacent to the square and installation of small architectural elements.

Maintaining straight lines and right angles across the entire surface of the square
was required, despite varying longitudinal and transverse slopes. The installation of linear drainage on concrete benches was carried out before laying the pavement and demanded precision from the contractor in order to align the drainage system with the paving pattern.
Thirty planting stations for trees were used with the Greenleaf Arborsystem – a modern, advanced solution that allows trees to be introduced even in the most unfavorable locations, protecting buildings and technical infrastructure from the harmful effects of root systems.