Presentation
Experience
We have 65 years of experience in construction and maintenance of roads and bridges. As the Capital Group we have operated since 1997.
Stability
We are a stable and reliable company. We have our own technical resources. We know how to run a business of road construction sector to be continuously profitable. Our capital is fully Polish.
Quality
We introduce the highest quality standards by using modern tools, learned know-how, and continually investing in our own R & D centres to ensure innovativeness of technologies used.
Potential
Our strength results from the scale of the investments in Poland and in the world, and from the size of the POL-DRÓG Capital Group – we know how to use the potential of the company in its development by making constant expansion into Eastern Europe and Asia Minor.
Innovativeness
We have the most modern R & D laboratories in Poland, which allows us to implement the most modern technology in the field of road engineering and construction.
Qualified Personnel
We employ the best professionals who know how to plan and carry out the work to be on time and fit in the budget. We take care of their sustainable development through our original program Resources Forge. We consistently strive to be the best employer in the industry.
Responsibility
We are responsible for our environment. We support local communities, sponsor sportsmen and do charity work.
Chronology
Human Resources and Equipment
9
BITUMINOUS
MASS PLANTS
252
CONSTRUCTION MACHINES
369
EMPLOYED ENGINEERS
Projects and Investments
Piła bypass – stages I and II
New connection between National Road No. 11 and Voivodeship Roads No. 188 and 179 – northwest section of the Piła city bypass (section from Al. Niepodległości to Al. Wojska Polskiego) and the final (second) phase of the construction of the Piła city bypass.
INVESTOR
Urząd Miasta Piły
CONTRACTOR
INVESTMENT COST:
LENGHT/SURFACE AREA:
Scope
PREPARATORY WORK
- Demolition of road and street elements
- Removal of trees and shrubs
- Cutting down of trees conflicting with the planned bypass

ROAD WORK
- Design and comprehensive construction of a single-carriageway municipal road with 2 traffic lanes, including a central dividing lane and additional turning lanes, classified as technical class G and traffic category KR4
- Construction of the base course using crushed aggregate and asphalt concrete
- Laying of asphalt concrete pavement and mineral-asphalt mix pavement with rubber additive
- Cold milling of the pavement
- Installation of concrete block pavement
- Execution of embankments and excavations
- Design and construction of sidewalks and bicycle paths
BRIDGE CONSTRUCTION
- Construction of a four-span reinforced concrete viaduct EG 2
- Construction of a three-span bridge MG 1
- Construction of a single-span bridge MG 3
INFRASTRUCTURE
- Reconstruction of overhead and underground power lines as well as underground telecommunications cable lines
- Reconstruction of underground water supply and gas pipelines
- Construction of stormwater drainage along the road, with discharge through a sedimentation basin and lamella separator to the Gwda River
- Construction of culverts and drainage ditches
- Installation of telecommunications ducting for the construction of the backbone broadband network
- Elimination of conflicts with existing foreign utilities
- Reconstruction of the water supply network, relocation of conflicts with power, telecommunications, and lighting infrastructure
- Protection of gas networks
FINISHING WORK
- Installation of traffic signals and other traffic safety devices
- Implementation of buffer greenery: creation of decorative green belts and additional plantings
- Construction of sidewalks, pedestrian and bicycle paths, pedestrian-vehicular pathways, and parking spaces
- Construction of 13 pedestrian crossings and bicycle passages; installation of new lighting along the entire planned bypass
Warta Bridge Renovation
Renovation of the bridge over the Warta River in the town of Koło on road No. 2, km 302+694.
INVESTOR
General Directorate for National Roads and Motorways, Poznań
CONTRACTOR
POL-DRÓG Piła (in consortium with “GOTOWSKI” Communication and Industrial Construction Ltd.)
INVESTMENT COST:
LENGHT/SURFACE AREA:
265 mb
Scope
PREPARATORY WORK
- Dismantling and removal from the construction site of the pavement on the roadway and around the abutments, including the base layer, existing protective concrete and isolation layers, weak concrete from the deck slab, protective barriers with railings, parts of cornices on the structure and abutments, expansion joints, and parts of the back walls of the abutments.

BRIDGE CONSTRUCTION
- Modernization of supports and load-bearing structure through repair of anti-corrosion coatings on the steel structure of the bridge, installation of new waterproofing and pavement on the entire deck including sections on the abutments.
- Construction of sidewalk curbs with curbstones and installation of rigid edge barriers and handrails.
- Comprehensive renovation of the abutments.
- Modernization of drainage by constructing a stormwater drainage system with discharge to the river.
- Reconstruction of expansion joints.
- Anti-corrosion protection of bearings.
- Repair of slope stairs and surface protection of concrete; stabilization of slopes and embankments.
FINISHING WORKS
- Replacement of sign fastening devices for navigation with new ones.
- Installation of horizontal and vertical signage on the structure.
- Installation of 62 benchmarks.
Modernization of the Tourist Heart of Sopot
Reconstruction of the Friends Square and Spa Square in Sopot
INVESTOR
Road and Greenery Management in Sopot
CONTRACTOR
POL-DRÓG Gdańsk
INVESTMENT COST:
10 641 234 PLN
LENGHT/SURFACE AREA:
13 000 m2
Scope
PAVEMENT WORK
- Installation of granite pavement over an area of 13,000 m² with a load class of D400, featuring a repetitive pattern using slabs of 6 different dimensions.
- Impregnation and filling of the pavement joints with resin grout.

INFRASTRUCTURE
- Drainage of the square using a linear drainage system with a total length exceeding 500 meters.
- Reconstruction of the stormwater drainage system including elements of the sanitary sewage system and the water supply network.
FINISHING WORK
- Installation of lighting and illumination of 39 trees using RGB LED fixtures.
- Placement of 30 planting stations for trees using the Greenleaf Arborsystem.
- Installation of a controlled irrigation system for trees and green elements.
- Execution of stone cladding on tunnel walls adjacent to the square and installation of small architectural elements.

Maintaining straight lines and right angles across the entire surface of the square was required, despite varying longitudinal and transverse slopes. The installation of linear drainage on concrete benches was carried out before laying the pavement and demanded precision from the contractor in order to align the drainage system with the paving pattern.
Thirty planting stations for trees were used with the Greenleaf Arborsystem – a modern, advanced solution that allows trees to be introduced even in the most unfavorable locations, protecting buildings and technical infrastructure from the harmful effects of root systems.
Dear Sirs
POL-DRÓG Capital Group is a Polish, modern and dynamic company in the road construction and infrastructure industry, operating on the market for over 65 years, introducing a real change in the environment. It is one of the leaders in Poland, employing up to 3,000 professionals during the season.
We design, build, modernize, finance, manage and maintain facilities that enhance our daily lives: communication infrastructure that is easy and pleasant to travel by, historic architectural treasures that bring the community around them, water supply and sewerage, gas and electricity networks, so that everyone has access to the utilities, necessary for a comfortable existance. And all this in accordance with strict rules, wth regard to the highest quality of services and products, and with uncompromising respect for the environment – the most precious good, for which we are responsible.
With great pleasure we present you a kind of almanac of POL-DRÓG, reflecting selected, in our opinion the most important investments.
We hope that so important to us quality, stability, innovation, qualified personnel, potetnial and resposibility will be reflected in your opinion about our company and encourage you to cooperate with us. We sincerely invite you to trust our experience.