Presentation

Experience

We have 65 years of experience in construction and maintenance
of roads and bridges. As the Capital Group we have operated since 1997.

Stability

We are a stable and reliable company. We have our own technical resources. We know how to run a business of road construction sector
to be continuously profitable. Our capital is fully Polish.

Quality

We introduce the highest quality standards by using modern tools, learned know-how, and continually investing in our own R & D centres 
to ensure innovativeness of technologies used.

Potential

Our strength results from the scale of the investments in Poland
and in the world, and from the size of the POL-DRÓG Capital Group – 
we know how to use the potential of the company in its development
by making constant expansion into Eastern Europe and Asia Minor.

Innovativeness

We have the most modern R & D laboratories in Poland, which allows
us to implement the most modern technology in the field of road engineering and construction.

Qualified Personnel

We employ the best professionals who know how to plan and carry
out the work to be on time and fit in the budget. We take care of their sustainable development through our original program Resources Forge. We consistently strive to be the best employer in the industry.

Responsibility

We are responsible for our environment. We support local communities, sponsor sportsmen and do charity work.

Chronology

Human Resources and Equipment

9

BITUMINOUS
MASS PLANTS

252

CONSTRUCTION MACHINES

369

EMPLOYED ENGINEERS

Projects
and Investments

Piła bypass – stages I and II

New connection between National Road No. 11 and Voivodeship Roads No. 188
and 179 – northwest section of the Piła city bypass (section from
Al. Niepodległości to Al. Wojska Polskiego) and the final (second) phase
of the construction of the Piła city bypass.

INVESTOR

Urząd Miasta Piły

CONTRACTOR

POL-DRÓG Piła (w konsorcjum z POL-DRÓG Wałcz  i Firmą „GOTOWSKI” Budownictwo Komunikacyjne i Przemysłowe Sp. z o.o.)

INVESTMENT COST:

69 727 741 PLN

LENGHT/SURFACE AREA:

5 066 mb

Scope

PREPARATORY WORK

  • Demolition of road and street elements
  • Removal of trees and shrubs
  • Cutting down of trees conflicting with the planned bypass

ROAD WORK

  • Design and comprehensive construction
of a single-carriageway municipal road with 2 traffic lanes, including a central dividing lane and additional turning lanes, classified as technical class G and traffic category KR4
  • Construction of the base course using crushed aggregate and asphalt concrete
  • Laying of asphalt concrete pavement and mineral-asphalt mix pavement with rubber additive
  • Cold milling of the pavement
  • Installation of concrete block pavement
  • Execution of embankments and excavations
  • Design and construction of sidewalks and bicycle paths

BRIDGE CONSTRUCTION

  • Construction of a four-span reinforced concrete viaduct EG 2
  • Construction of a three-span bridge MG 1
  • Construction of a single-span bridge MG 3

INFRASTRUCTURE

  • Reconstruction of overhead and underground power lines as well as underground telecommunications cable lines
  • Reconstruction of underground water supply
and gas pipelines
  • Construction of stormwater drainage along the road,
with discharge through a sedimentation basin and lamella separator to the Gwda River
  • Construction of culverts and drainage ditches
  • Installation of telecommunications ducting
for the construction of the backbone broadband network
  • Elimination of conflicts with existing foreign utilities
  • Reconstruction of the water supply network, relocation
of conflicts with power, telecommunications, and lighting infrastructure
  • Protection of gas networks

FINISHING WORK

  • Installation of traffic signals and other traffic safety devices
  • Implementation of buffer greenery: creation of decorative green belts and additional plantings
  • Construction of sidewalks, pedestrian and bicycle paths, pedestrian-vehicular pathways, and parking spaces
  • Construction of 13 pedestrian crossings and bicycle passages; installation of new lighting along the entire planned bypass

Warta Bridge Renovation

Renovation of the bridge over the Warta River in the town of Koło on road No. 2, km 302+694.

INVESTOR

General Directorate for National Roads and Motorways, Poznań

CONTRACTOR

POL-DRÓG Piła (in consortium with „GOTOWSKI” Communication and Industrial Construction Ltd.)

INVESTMENT COST:

8 384 616 PLN

LENGHT/SURFACE AREA:

265 mb

Scope

PREPARATORY WORK

  • Dismantling and removal from the construction site
of the pavement on the roadway and around
the abutments, including the base layer, existing protective concrete and isolation layers, weak concrete from the deck slab, protective barriers with railings, parts of cornices on the structure and abutments, expansion joints, and parts of the back walls
of the abutments.

BRIDGE CONSTRUCTION

  • Modernization of supports and load-bearing structure through repair of anti-corrosion coatings on the steel structure of the bridge, installation of new waterproofing and pavement on the entire deck including sections
on the abutments.
  • Construction of sidewalk curbs with curbstones
and installation of rigid edge barriers and handrails.
  • Comprehensive renovation of the abutments.
  • Modernization of drainage by constructing a stormwater drainage system with discharge to the river.
  • Reconstruction of expansion joints.
  • Anti-corrosion protection of bearings.
  • Repair of slope stairs and surface protection
of concrete; stabilization of slopes and embankments.
  •  

FINISHING WORKS

  • Replacement of sign fastening devices for navigation with new ones.
  • Installation of horizontal and vertical signage
on the structure.
  • Installation of 62 benchmarks.

Modernization of the Tourist
Heart of Sopot

Reconstruction of the Friends Square and Spa Square in Sopot

INVESTOR

Road and Greenery Management in Sopot

CONTRACTOR

POL-DRÓG Gdańsk

INVESTMENT COST:

10 641 234 PLN

LENGHT/SURFACE AREA:

13 000 m2

Scope

PAVEMENT WORK

  • Installation of granite pavement over an area of 13,000 m² with a load class of D400, featuring a repetitive pattern using slabs of 6 different dimensions.
  • Impregnation and filling of the pavement joints
with resin grout.

INFRASTRUCTURE

  • Drainage of the square using a linear drainage system with a total length exceeding 500 meters.
  • Reconstruction of the stormwater drainage system including elements of the sanitary sewage system
and the water supply network.

FINISHING WORK

  • Installation of lighting and illumination of 39 trees
using RGB LED fixtures.
  • Placement of 30 planting stations for trees using
the Greenleaf Arborsystem.
  • Installation of a controlled irrigation system
for trees and green elements.
  • Execution of stone cladding on tunnel walls adjacent
to the square and installation of small architectural elements.

Maintaining straight lines and right angles across the entire surface of the square
was required, despite varying longitudinal and transverse slopes. The installation of linear drainage on concrete benches was carried out before laying the pavement and demanded precision from the contractor in order to align the drainage system with the paving pattern.

Thirty planting stations for trees were used with the Greenleaf Arborsystem – a modern, advanced solution that allows trees to be introduced even in the most unfavorable locations, protecting buildings and technical infrastructure from the harmful effects of root systems.

Dear Sirs

POL-DRÓG Capital Group is a Polish, modern and dynamic company in the road construction and infrastructure industry, operating on the market for over 65 years, introducing a real change in the environment. It is one of the leaders in Poland, employing up to 3,000 professionals during the season.

We design, build, modernize, finance, manage and maintain facilities that enhance our daily lives: communication infrastructure that is easy and pleasant to travel by, historic architectural treasures that bring the community around them, water supply and sewerage, gas and electricity networks, so that everyone has access to the utilities, necessary for a comfortable existance. And all this in accordance with strict rules, wth regard to the highest quality of services and products, and with uncompromising respect for the environment – the most precious good, for which we are responsible.

With great pleasure we present you a kind of almanac of POL-DRÓG, reflecting selected, in our opinion the most important investments.

We hope that so important to us quality, stability, innovation, qualified personnel, potetnial and resposibility will be reflected in your opinion about our company and encourage you to cooperate with us. We sincerely invite you to trust our experience.

Polski flag
English flag